Photovoltaic ligthing in Stara Zagora.

Since 1997 the former Electricity Distribution Company – Stara Zagora and its branches in Stara Zagora, Chirpan, Radnevo and Galabovo have being our main partners provided with services as follows: construction and repairs of overhead and cable lines middle and low voltage; overhaul of transformer stations; installation of concrete compact transformer stations, displacement of switchboards outside the property /on a property boundary/. After the privatization of the electricity distribution companies Elmi Ltd. concluded a contract with EVN Bulgaria for construction, wiring and excavation works and repairs on sites and facilities of its client energy centers as KEZ Stara Zagora, KEZ Chirpan, KEZ Zagore. Besides, Elmi Ltd. obtained an award of tender procedure contractor of EVN client energy centers in towns of Haskovo, Radnevo, Nova Zagora and Pomorie. 

 

Elmi_Vetrokom-1.jpg  

Construction site

Vetrocom Buzludzha: Installation of wind farm with 29 wind turbine generators of 2.5 MW
Construction site altitude – 1400 meters
Total capacity of installed power: 72,5 MW
The design project is developed by Fuhrlander, Germany.
Contracting authority: Vetrocom Ltd.

Construction works

Construction of engine seating for 29 wind turbine generators and all necessary crane plots and loading platforms
In 2009 – installation of 20 wind turbine generators of 2.5 MW 
In 2011 – installation of 9 wind turbine generators of 2.5 MW - 2011 г.
Total amount of reinforcement - 1 450 t
Total amount of concrete - 11 220 м3 
Complete installation of internal electric networks - 48 km (cable line with middle voltage, diameter 120-140 mm2); external electric networks – 9 km (from substation 20/110kv to overhead lines 110kv, realized with ABB cable 110kv type AXLJ 1x400/40) and communication cable routing – 38 km (optic underground cables laying between generators and pulled out along the overhead line 110kv).

 

 Vetrokom.jpg 

Construction site

 

Photovoltaic park, village of Samovodene, 3 MW

Construction works Construction of foundations; assembly of metal structure and PV panels
Construction of cable lines and premises; installation of high voltage equipment, transformers and invertors
 Elmi_SUNDAY-SDN-1.jpg

Construction site

Photovoltaic park, village of Zlataritsa, 21 MW

Construction works Excavation works for vertical planning - 1 100 000 м3
Construction site

 

 

 

 

Photovoltaic park, village of Ostar kamak, region of Harmanli, 5 MW
Excavation works for vertical planning – 250 000 м3
Contracting authority: SUNDAY SDN, Korea 

Construction works

Construction of foundations; assembly of metal structure and PV panels
Construction of cable lines and premises; installation of high voltage equipment, transformers and invertors


Construction site

EVN Distribution Company Bulgaria, Stara Zagora 
 
Construction works

Framework Contract for construction, wiring and excavation works and repairs on the territory of the Client Energy Centers in Stara Zagora, Chirpan and Zagore (external power supply of buildings, construction of tube, cable and overhead lines low and middle voltage; construction of concrete, metal and mast transformer stations) 


Construction site

Park Mall Plovdiv 

Contracting authority: Instroy Ltd.
Construction works

Construction of electric installations and terminals for power supply to temporary switchboards at a total amount of 16 081.53 €

 

 mall3.jpg 

Construction site

Park Mall: External power supply of Shops & Entertainment Center with underground parking by a transformer station

Project amount: 287 487.89 € 
Contracting authority: Eurobuild Ltd.

Construction works

Installation of external power supply, cables, tube lines, transformers and supply with transformer station equipment 


Construction site

Shopping Center, Parvomay: Overhaul, reconstruction and construction 

Project amount: 219 558.30 BGN.
Contracting authority: Adelmax Ltd.
Construction works

Destruction of the old building; excavation works (excavation, transportation, gravel-embankment, consolidation and vertical planning). Construction of external and internal sewerage, water-conduit, power supply installation and fire alarm system 


Construction site

Logistic Center 

Project amount: 76 726.34 € 
Contracting authority: Logistic BG Ltd.
Construction works

External and internal power supply (supply and pulling out of cables middle and low voltage /type abbreviation CVT, PBB-MB1, UTP/, industrial and public lightning, etc.); water-supply network, sewerage, fire alarm system, geodesic surveying and vertical planning. 


 knauf.jpg 

Construction site

Knauf Bulgaria: Construction of road connection from III-5504, km 4+950 to Knauf gypsum factory km 0+000 to km 1+900.

Project amount: 1 108 184.55 €
Contracting authority: Municipality of Galabovo (tender procedure award)
Construction works

Construction and assembly works 


Construction site

Knauf gypsum factory

Project amount: 221 584.61€
Contracting authority: Knauf Bulgaria Ltd.

Construction works

Construction works, road construction, wiring, fence construction, routing of water and gas sewerage systems, technological works.
Wiring consists in supplying and pulling out of plastic tubes in a trench, covering by sand, pulling out of cable type HH, installation of cable box 240мм2, etc.


Construction site

Medven Asphalt Works: Feeder cables low and middle voltage 

Project amount: 81 922.00 BGN
Contracting authority: Stara Zagora Road Maintenance Company Ltd.
Construction works

Construction of tube network for cables, construction of concrete compact transformer station 20кV


autohit2.jpg

Construction site

Showroom, service-station and office-buildings located on the land of Stara Zagora, Chanlak country, property No 002489

 Project amount: 141 510.00 BGN.
Contracting authority: Autohit 2000 Ltd.
Construction works

Supply and fitting, disassembly and assembly of cables, construction of concrete compact transformer station, etc.


 ekovat.jpg 

Construction site

External wiring of photovoltaic turbine generators situated on the land of Sarnevo village, Cheliyata contry, property No 075011

 Project amount: 30 665.00 € 
Contracting authority: Ecovat Ltd. 


Construction works

Delivery and assembly of cables; construction of concrete compact transformer station, delivery and assembly of transformers, testing of high voltage cables, etc.


Construction site

Framework Contract for construction works in Mtel Shop Centers, Bulgaria 

Contracting authority: Mobiltel EAD
Construction works

Emergency and routine repairs in Mtel shop centers


Construction site

Stara Zagora Municipality 

Contracting authority: Municipality of Stara Zagora

Construction works

Road reconstruction; reconstruction of Stara Zagora bus station; reconstruction of tube networks of Bulgarian Telecommunication Company, EVN Bulgaria, Cable Tel company on the territory of Stara Zagora Municipality.

Construction works

Installation and maintenance of a new public lightning in town of Stara Zagora 
Contracting authority: Hit Ltd.


Construction site 

Park Mall Stara Zagora & Arena Cinema 

Contracting authority: Park Mall Stara Zagora; Arena Cinema
Construction works

External wiring and lightning


Construction site

PMU AD 

Project amount: 31 602.79 €
Construction works

Power supply of cathodic stations 


Construction site

Supermarket Billa Dimitrovgrad 

Excavation works and vertical planning


Construction works

Ministry of Labour and Social Policy 

Reconstruction of the regional office-buildings in town of Stara Zagora


Construction site

Hypermarket Praktiker 

Project amount: 222 300.00 BGN

Construction works

External power supply of Hypermarket Praktiker Stara Zagora; pulling-out of cables 20 kV, assembly of transformers, installation of commutation distribution devices 20 kV

Central Railway Station Sofia 

Project amount: 236 106.00 BGN
Contracting authority: Railway Infrastructure National Company, Energy Department, Sofia

Construction works

Reconstruction of the station platforms’ lighting 


Construction site

Horizont – Ivanov Ltd. 

Project amount: 107 416.88 €
Contracting authority: Horizont – Ivanov Ltd.

Construction works

Buildings demolition; foundations and shafts removal; breaking of the concrete waste in fractions; separate waste collection 

 

Our clients
 

EVN Distribution Company Bulgaria, Stara Zagora
EON Bulgaria, Varna
Railway Infrastructure National Company, Energy Department, Sofia
Municipality of Stara Zagora|
Municipality of Galabovo
Mini Maritsa Iztok EAD, Radnevo
Enemona JSC, Galabovo 
SUNDAY SDN, Korea
Mtel JSC
Knauf Bulgaria Ltd. 
Overgas Company
Road Construction Company ABS JSC
Logistic BG Ltd. 
Auto Via Ltd.
Biser Oliva JSC
Magnit Mat Ltd.
Zagora Construction Company EAD
Construction and assembly - Radnevo Ltd.

 

References

FULDA_Haskovo.jpg adelmax.jpg EVN_KEC_St_Zagora.jpg EVN_KEC_Zagore.jpg Gara_Sofia.jpg Gara_Sofia_1.jpg
 Knauf.jpg  Avtohit1-2000.jpg  Logistik.jpg  Praktiker.jpg  Vetrokom.jpg  Knauf_patista.jpg